Client: University of Ontario Institute of Technology (UOIT)
Completion Date: September 2010
Description:
This project involved the interior renovation of a heritage theatre to be transformed into a 700 seat lecture hall with the capability of holding musical performances. The work involved a large-scale hazardous materials abatement, structural upgrades for audio, video, lighting and rigging equipment, the restoration of the ornate plaster ceilings and the complete renovation of the theatre space. Construction commenced in early July and the grand opening speech was conducted by the President of UOIT on September 9, 2010.
Project Value: $2.3 Million